The E2 Step: EQUIPMENT & ACCESSORIES — Complete the System
Beyond the pump itself, the E2 step (the 2nd E after the one in STAMPED) defines the supporting equipment required for a complete and functional system. Teams should account for:
- Motor type (TEFC, washdown, explosion-proof)
- Gearbox requirements
- Seal configuration (single, double, flushed)
- Baseplate or skid design
- Instrumentation (pressure gauges, flow meters)
- Relief valves and protection devices
- Spare parts and maintenance expectations
By accounting for E2 upfront, teams can properly scope the entire pump package and avoid gaps that often lead to change orders, delays, or margin erosion.
Why This Matters — The 80/20 Rule of Pump Selection
The STAMPED + E2 framework gives teams a complete way to evaluate the application. Some companies make the mistake of giving equal weighting to all factors. In practice, however, certain sections carry greater weight in determining success. The Media, Pressure, and Dynamics sections drive the majority of outcomes—often accounting for nearly 80% of positive displacement pump success or failure. This is because they directly define how the pump interacts with the fluid, responds to system resistance, and performs under real operating conditions. 20% is everything else: still important, but not quite as crucial as MPD. Internal pump discussions and application reviews consistently emphasize fluid behavior (such as viscosity and solids), system requirements (flow and differential pressure), and operating conditions (speed, control, and duty cycle) as the primary drivers of pump selection decisions. When teams do not properly define these elements:
- Pumps are misapplied
- Seal failures increase
- Performance issues occur (slip, cavitation, pulsation)
- Costly rework and delays follow
When they are clearly defined upfront:
- Pump selection aligns with actual operating conditions
- Quotes are faster and more accurate
- Vendors respond more effectively
- Long-term reliability improves